Rose-Alan

By continuing you are confirming you have read and accepted the applicable Terms and Conditions:

  • Public Charger Terms of Use

Up to 7kW

Up to 7kW

Description
The sub main supply to the DB which the pod is fed from is being overloaded when both doors are being used. Their responsibility. This is why have inconsistent comms. Door A is isolated and will be until they solve the problem.
Location
Keele
Staffordshire
ST5 5AZ
Connector A Status
  • Available
  • Type 2 socket
  • Single Phase AC
Connector B Status
  • Available
  • Type 2 socket
  • Single Phase AC
Pricing
Free